Verification of the Installed Peak Power in the Commissioning Tests of Large PV Plants
 
Author(s):
 
J. Coello, F. Domínguez
 
Keywords:
 
Quality Control, Testing and Characterisation, PV Module
 
Topic:
 
PV Systems
Subtopic: Large PV Power Plants and Distributed PV: System Aspects and Grid Connection
Event: 27th European Photovoltaic Solar Energy Conference and Exhibition
Session: 5AV.1.34
 
Pages:
 
3983 - 3985
ISBN: 3-936338-28-0
Paper DOI: 10.4229/27thEUPVSEC2012-5AV.1.34
 
Price:
 
 
0,00 EUR
 
Document(s): paper
 

Abstract/Summary:


This article presents a methodology to verify the peak power of the generator (PV modules) in the commissioning test of large scale PV plants. This procedure has been implemented in the commissioning of many large PV plants from 2008 in Spain and Italy with very good results. This methodology is a very useful tool to control the quality of PV plants and enables, when is included in the construction contracts, adjust the final price to the real installed peak power.